Roadmap — phased plan
Absorbed into the master plan. Phases 1-10 are mostly shipped (see §1); the remaining items live in §3 — primarily Phase 7 (browser perf v2, deferred post-HN), Phase 4 finishing distillation runs (gated on training), and Phase 5 MoE+distill capstone.