ROI-ordered backlog
Absorbed into the master plan §3 (“TODO”). Tier A (do next) / Tier B (next quarter) / Tier C (polish) ordering preserved; Tier D (deferred) is now §2 “deferred”. Edit
PLAN.md, not this file.
docs/backlog.md · view on GitHub ↗ Absorbed into the master plan §3 (“TODO”). Tier A (do next) / Tier B (next quarter) / Tier C (polish) ordering preserved; Tier D (deferred) is now §2 “deferred”. Edit
PLAN.md, not this file.